HEI designed and constructed a one-of-a-kind iron-enhanced sand filter to treat water flowing into and out of Hansen Pond.


HEI designed and constructed a one-of-a-kind iron-enhanced sand filter to treat water flowing into and out of Hansen Pond.
Hansen Park is in the Rice Creek Watershed District (RCWD) in New Brighton, Minnesota. This park, along with other areas in the District, was prone to extreme flooding and storm damage. These floods led HEI and the RCWD to create a $7.2-million project, the Long Lake Targeted Watershed Demonstration Program, which is partially funded through a Clean Water Fund grant from the Minnesota Board of Water and Soil Resources.
In 2013, the cities of New Brighton, St. Anthony Village, and Roseville petitioned to create the Basic Water Management Project. The project would address stormwater management and flooding within the drainage area of Ramsey County Ditch 2, which flows into the Hansen Park pond. This petition launched the RCWD and HEI into the first phase of this project: analyzing current conditions of the drainage area and how they could be improved with the Basic Water Management Project.
Through this analysis, HEI proposed the Hansen Park project as a solution for water quality and flooding. The City of New Brighton took HEI’s findings and incorporated the project into an amended petition. On June 11, 2014, the RCWD accepted the amended petition and began to work in earnest to develop the background information and concept plans for the Hansen Park project.
HEI worked with stakeholders to design the multi-benefit project. This design married together several innovative best management practices, including:
To be sure we had a full understanding of the site, our drone team captured videos of the existing site. They have continued to visit the site and take more videos to ensure the construction continues as planned.
However, no matter how much we try to plan there are some things that are simply out of anyone’s control.
To begin this construction project, HEI oversaw 60,000 cubic yards of material dredged from the site. When construction plans and schedules were set, our team banked on freezing January and February temperatures to set a firm foundation. They also planned on the freezing temperatures only causing a minimal soil swell. This would make dredging and removal much easier than with a larger swell.
When construction began in 2016, the temperatures were just as cold as anticipated and everything seemed to be running smoothly. Then, in mid-January, temperatures sky-rocketed. Dark surfaces absorb more energy than light, so even though snow stuck around, the very soil we were settled on warmed too much. Instead of the firm ground we planned for, we were suddenly sinking in muddy slush, digging up sloppy soils, and removing just over half the tonnage of sediment a day than we originally planned.
With these difficult conditions, our crew unexpectedly had to coordinate with multiple landfills that would accept the soils and, eventually, extend the dredging and removal schedule into the next winter.
Despite the frustration of a warm season, our team found an inexpensive fix to the seemingly costly problem: wood chips. The wood chips acted as a thermal barrier, preventing soils from warming and giving us a firm foundation to work on.
Even with these weather woes, construction of the iron-enhanced sand filter was successfully completed in the fall of 2018 along with the other project components. The project provides an example of water quality and flood projections showing progress toward state water quality goals.
With a budget of $4 million, Hansen Park is the largest (and most complicated) project in RCWD history. To fund this massive undertaking, the RCWD pulled from a $3-million Targeted Watershed Demonstration Project (TWDP) grant they were awarded in 2014. With a required $2-million match from the District, this grant covered $1.5-million of the $4-million project.
Learn more about the project on page 4 and 5 of the 2020 Spring/Summer HEI Newsletter.

Client: Rice Creek Watershed District
Location: New Brighton, Minnesota
explore our
We use cookies to enhance your browsing experience, provide analytics, and improve our services. By choosing “Accept” you consent to our use of cookies as described in our Privacy Policy.
We begin by thoroughly researching available grant opportunities to identify those best suited to your specific project needs. Our team leverages our deep understanding of federal, state, and local grant programs, as well as foundation grants, to ensure a comprehensive search. We evaluate eligibility criteria, funding priorities, and timelines to match your project with the most appropriate funding sources. This targeted approach maximizes the potential for securing financial support for your project.