Real North 2 - Houston Engineering INC.
Real North (Ace TrueValue) Hardware

HEI was retained to create a site plan for a proposed new hardware store in Bismarck, ND.

Background

HEI was retained to create a site plan for a proposed new hardware store. The owner had a southern location in the community and was seeking a northern location for business expansion. The selected site was reviewed, and several concept drawings were created to determine how the site could be utilized to its full potential, including creating a minor plat to parcel out three lots from the large existing single lot.

The Project

The site was a great commercial location; however, there were limitations associated with traffic access, topography, storm water master planning, and size to accommodate the proposed building.

HEI’s services included completing a traffic impact study to validate vacating a portion of the non-access line to improve traffic flow into and out of the site; development of alternative concepts to optimize site uses for the hardware store, leasable areas in the main building, and use of remaining property for a viable out lot; compliance with an existing storm water management plan; and construction surveying and staking.

The owner elected to use concrete paving and retaining walls, which simplified provisions for controlling site grading and drainage.

Client Benefits

  • Traffic impact study to vacate a portion of the street non-access line to better facilitate site operations.
  • Created a storm water management system that complies with an older watershed master plan.
  • Vacation and use of old street right-of-way to expand the development.
  • 3-D marketing drawings.
  • Evaluation of out-lot uses and configurations to enhance the site.
  • Construction surveying.
Project Details

Client: Real North Hardware, LLC

Location: Bismarck, ND

Project Highlights

Client Benefits

  • Traffic impact study to vacate a portion of the street non-access line to better facilitate site operations.
  • Created a storm water management system that complies with an older watershed master plan.
  • Vacation and use of old street right-of-way to expand the development.
  • 3-D marketing drawings.
  • Evaluation of out-lot uses and configurations to enhance the site.
  • Construction surveying.
Services

Ready to start a project?

Get in touch with our Environmental experts today.

Related Projects

Southern Sarpy Watershed Management Plan
View More
Restoration of Three Mile Lake
View More
Standing Bear Boat Ramp Replacement
View More
RCWD Changing Climate and Floodplain Resiliency
View More
Scroll to Top

Grant Research

We begin by thoroughly researching available grant opportunities to identify those best suited to your specific project needs. Our team leverages our deep understanding of federal, state, and local grant programs, as well as foundation grants, to ensure a comprehensive search. We evaluate eligibility criteria, funding priorities, and timelines to match your project with the most appropriate funding sources. This targeted approach maximizes the potential for securing financial support for your project.