FYRA Engineering, now a part of Houston Engineering, Inc. (HEI), completed the final design and permitting of levee improvements required for Federal Emergency Management Administration (FEMA) accreditation to this levee system.


FYRA Engineering, now a part of Houston Engineering, Inc. (HEI), completed the final design and permitting of levee improvements required for Federal Emergency Management Administration (FEMA) accreditation to this levee system.
Federal Levee Systems R-613 and R-616-613 are in Sarpy County, NE, near the confluence of the Platte and Missouri rivers. The 18.2 miles of earthen levee systems protects billions in local infrastructure and commerce including areas of Offutt Air Force Base and the Papillion Creek Wastewater Treatment Facility.
FYRA Engineering, now a part of Houston Engineering, Inc. (HEI), completed the final design and permitting of levee improvements required for Federal Emergency Management Administration (FEMA) accreditation to this levee system. The designed levee modifications included floodwall construction, closure section modifications, levee height increases, concrete pedestrian trail design, culvert/penetration modifications and replacement, and significant under-seepage mitigation in the form of seepage berms and relief wells.
Environmental permitting included aquatic resource delineations, preparation of a biological assessment, a full environmental assessment (EA) to meet National Environmental Policy Act (NEPA) requirements, and 404 permitting. The amount of wetland impacts required an individual 404 permit, so a 404(b)1 alternatives analysis was completed and a 12-step mitigation plan was developed as well. An off-site wetland mitigation area was also designed for this project.
All work was conducted in accordance with 44 CFR 65.10 and was reviewed in parallel by the US Army Corps of Engineers (USACE) Omaha District for 408 permission and 404 approvals. The proximity of three different riverine systems provided a unique challenge to the levee system analysis and design phase.
Hydrologic and hydraulic modeling for the interior drainage analysis was used to determine flood impacts on the landside of the levees system at each drainage penetration. HEC-HMS and HEC-RAS models of the Missouri and Platte rivers and Papillion Creek were used to finalize the study. Coordination with federal, state, and local entities was imperative throughout the project.
Learn more about this project in our StoryMap.
Client: Papio-Missouri River Natural Resources District
Location: Sarpy County, Nebraska
explore our
Sign-up for Updates & latest HEI News.
We begin by thoroughly researching available grant opportunities to identify those best suited to your specific project needs. Our team leverages our deep understanding of federal, state, and local grant programs, as well as foundation grants, to ensure a comprehensive search. We evaluate eligibility criteria, funding priorities, and timelines to match your project with the most appropriate funding sources. This targeted approach maximizes the potential for securing financial support for your project.