For decades, the City of Moorhead has maintained a highly detailed emergency flood operations plan, which includes actions required to activate flood mitigation infrastructure and emergency measures. However, the increasing frequency and severity of floods made clear the need for a more comprehensive flood mitigation program.

Background

For decades, the City of Moorhead has maintained a highly detailed emergency flood operations plan, which includes actions required to activate flood mitigation infrastructure and emergency measures. However, the increasing frequency and severity of floods made clear the need for a more comprehensive flood mitigation program.

The Project

A Permanent Solution to Recurring Floods
In 2009 alone, the City of Moorhead’s emergency flood fighting efforts included:

  • 9 miles of sandbag levees,
  • 9 miles of clay levees, and
  • 61 emergency auxiliary pumps.

These emergency efforts were sufficient to carry the City through that year’s flood event, but construction emergency protections was not a reliable long-term solution for the City and its residents and businesses. The City crafted a comprehensive flood mitigation strategy aimed at reducing flood risks, and the first phases were initiated immediately following the 2009 flood crest. The project was developed incrementally and received modifications and expansions over several years.

The Statistics

Approximately $105 million in funding was acquired to construct comprehensive flood protection throughout Moorhead. Houston Engineering, Inc. (HEI) assisted with City with design and other services for more than 50% of all permanent flood control work undertaken as part of this effort.

  • Significantly reduced the City’s reliance on emergency flood protection measures, dramatically reducing deployment times.
  • Implementation of closure structures keeps traffic flowing on high-volume roadways during non-flood times.
Project Details

Client: City of Moorhead

Location: Moorhead, Minnesota

Project Highlights
  • Significantly reduced the City’s reliance on emergency flood protection measures, dramatically reducing deployment times.
  • Implementation of closure structures keeps traffic flowing on high-volume roadways during non-flood times.
Services

Ready to start a project?

Get in touch with our Water Resources experts today.

Related Projects

2D BLE Floodplain Modeling
View More
Papillion Creek Watershed Hydrologic Modeling Update
View More
Big Elk Lakes (Dam Site WP-7) Spillway Design
View More
Portal Lake (Dam Site WP-6) Geotechnical Engineering, Permitting, and Construction Phase Services
View More
Scroll to Top

Grant Research

We begin by thoroughly researching available grant opportunities to identify those best suited to your specific project needs. Our team leverages our deep understanding of federal, state, and local grant programs, as well as foundation grants, to ensure a comprehensive search. We evaluate eligibility criteria, funding priorities, and timelines to match your project with the most appropriate funding sources. This targeted approach maximizes the potential for securing financial support for your project.