Minot Downtown Infrastructure Improvements

Minot Downtown 4 - Houston Engineering INC.
Minot Downtown Infrastructure Improvements

Overview

In order to keep up with population growth, planned commercial development, and recent flood recovery efforts, the City of Minot enlisted the joint team of HEI and MWH Global (now part of Stantec) to overhaul the City’s downtown infrastructure.

Background: When the Mouse Roared

2011 was the year the Mouse roared. “Boil the Damn Water!” made national news, as well as kickstarting a pretty humorous YouTube video. But for our friends and neighbors in Minot impacted by the flood’s devastation, it was anything but funny.

Refusing to lose was a theme for the City of Minot. Staff working around the clock to protect as much as possible, then doing the same to fix what was lost or broken. At the same time, the City faced the challenge of history—how do we avoid the outmigration experienced in 1969 following the last devastating flood event? How do we ensure that Minot will emerge from this disaster stronger and safer than ever?

Recovery efforts were amazing to watch and to be part of—as one Corps of Engineers consultant said, “I’ve noticed you guys don’t wait around for the Government to do it for you.” Leadership on a local, State and Federal level worked together to prioritize and fix what the river destroyed and identify how to make Minot better than ever, all the while planning to muzzle the Mouse once and for all.

The Project: Minot Roared Back

One obvious target to ensure the future of Minot was the renovation of the Downtown infrastructure. Aged and aging underground and surface infrastructure could simply not support the vision of a modern, vibrant, revitalized heart of the City.

With input from local leaders and the business community, Minot’s own Senator John Hoeven spearheaded the effort to secure the cornerstone Economic Development Administration funds for the Downtown Revitalization efforts, with additional critical funding from Community Development Block Grant –Disaster Recovery funds, and ND State Water Commission funding. A large part of the project funding was provided locally as well, through storm sewer and street lighting district special assessments, utility bonds, and surge funding—demonstrating Minot’s commitment to its future and refusing to lose.

Throughout the project development and construction process, City officials, administration, and staff worked together with the Downtown Business and Professional Association to minimize project impacts and rapidly communicate construction activity to maintain business access. Downtown stayed open throughout the three-year construction period, meeting one of the most critical and ambitious project goals.

From the perspective of the technical team—the joint venture of Houston Engineering, Inc. (HEI) and MWH Americas (now part of Stantec), with partners Odney, Inc. and 505 Design—being a part of this historic effort was both challenging and satisfying.

Developing and implementing state-of-the-art software tools to expedite project design and help manage construction while working closely with the City and fellow Downtown businesses to revitalize the heart of Minot enabled us to do what we do best—provide sustainable, cost-effective infrastructure solutions.

  • Upgraded public infrastructure to be compatible with planned flood protection projects as described in the Mouse River Enhanced Flood Protection Preliminary Engineering Report.
  • Upgraded infrastructure to meet current capacity and condition requirements and standards as defined by the City, North Dakota Department of Water Resources, North Dakota Department of Health, and North Dakota Department of Transportation.
  • A project website was created to keep residents informed about progress and any planned disturbances.
Project Details

Lorem Ipsum

Client: City of Minot

Location: Minot, North Dakota

Project Highlights
  • Upgraded public infrastructure to be compatible with planned flood protection projects as described in the Mouse River Enhanced Flood Protection Preliminary Engineering Report.
  • Upgraded infrastructure to meet current capacity and condition requirements and standards as defined by the City, North Dakota Department of Water Resources, North Dakota Department of Health, and North Dakota Department of Transportation.
  • A project website was created to keep residents informed about progress and any planned disturbances.
Services

Ready to start a project?

Get in touch with our Municipal Infrastructure experts today.

Related Projects

15th Street Bicycle Boulevard
View More
Harwood Quiet Zone Improvements
View More
Multi-Year Work Plan for Track Stabilizations
View More
Otter Creek Lake and Park Restoration Project
View More
Scroll to Top