Great River Energy Route Analysis for a Project Corridor Between Athens and Martin Lake Substations


Great River Energy Route Analysis for a Project Corridor Between Athens and Martin Lake Substations
Great River Energy (GRE), a non-profit electric cooperative owned by its 28 member cooperatives (including Connexus Energy), generates and transmits electricity throughout Minnesota. GRE, together with Connexus Energy, intends to construct a 69,000 volt (69 kV) transmission line from the Athens Substation (Athens Township) to the Martin Lake Substation (Linwood Township) across a portion of East Bethel, Minnesota. The project spans portions of Isanti and Anoka counties.
GRE retained HEI to perform a route analysis for a 69 kV transmission line connecting the Athens Substation to the Martin Lake Substation. Connexus Energy requested this project in anticipation of continued population growth in this area. The proposed transmission line will improve reliability of service in East Bethel and surrounding areas, particularly during peak demand hours.
The Project included a route analysis for the 69 kV transmission line. The purpose of the route analysis was to identify the preferred route based on a comparative analysis of factors including social, environmental, and engineering considerations. In addition, a natural resources and wetland field inventory was conducted along the transmission corridor to identify cover types; potential rare, threatened, and endangered species habitat and natural communities; locations and types of jurisdictional wetland; land uses; and existing structures. Informal consultation with the US Fish and Wildlife Service regarding threatened and endangered species was conducted. Ultimately, 34 route segments were identified and combined to form 26 potential routes between the two substations. From these options, the preferred route and two alternative routes were presented to GRE.
A Class I Cultural Resource File and Record Search was conducted for the area encompassing potential transmission line route corridors.
The Class I file search consisted of reviewing the site files and the manuscript collection at the State Historical Society. A cultural report was prepared from the Class I file search that identified the architectural sites, architectural site leads, and architectural and historic archaeological sites in the proposed corridors.
Location: Athens Township, East Bethel, and Linwood Township, Minnesota
explore our
We use cookies to enhance your browsing experience, provide analytics, and improve our services. By choosing “Accept” you consent to our use of cookies as described in our Privacy Policy.
We begin by thoroughly researching available grant opportunities to identify those best suited to your specific project needs. Our team leverages our deep understanding of federal, state, and local grant programs, as well as foundation grants, to ensure a comprehensive search. We evaluate eligibility criteria, funding priorities, and timelines to match your project with the most appropriate funding sources. This targeted approach maximizes the potential for securing financial support for your project.