Background

Tharaldson Energy Group (TEG) selected a site 2 miles west of Casselton for a new Ethanol Plant. The 160-acre site was laid out to include room for future expansion, storage, and rail service. The initial production will require approximately 275 semi loads of corn per day.

The Project

The project consisted of upgrading the existing township road into an all-weather truck route. Cass County 10 parallels I-94 north of Casselton and is a concrete road.

The proposed north-south link off of the I-94 interchange to Cass County 10 needed to be designed and built in an expeditious manner to serve the 2008 start-up. Additionally, the plant started construction in the spring of 2007. The old road has been overtopped by spring flooding on numerous occasions, so a profile raise was necessary, as well as new drainage structures.

In addition to Cass County 23 and the new precast RCB, a companion project was undertaken to improve the T intersection with Cass County 10. Approximately 0.5 miles of Cass County 10 was reconstructed on either side of the Cass County 23 intersection to accommodate new left and right turn lanes.

  • Cass County 23 was raised, widened, and reconstructed with new 10.5-inch PCC pavement.
  • New BNSF Railway crossing upgrade, including precast concrete planks and signals.
  • HEI coordinated with Cass County; BNSF Railway; and TEG’s contractor, Wanzek Construction.
  • New 36-inch-wide section with turn lanes and southbound bypass lane.
  • New RCB and other culverts with approaches for all other access.
Project Details

Client: Cass County Highway Department

Location: Cass County, ND

Project Highlights
  • Cass County 23 was raised, widened, and reconstructed with new 10.5-inch PCC pavement.
  • New BNSF Railway crossing upgrade, including precast concrete planks and signals.
  • HEI coordinated with Cass County; BNSF Railway; and TEG’s contractor, Wanzek Construction.
  • New 36-inch-wide section with turn lanes and southbound bypass lane.
  • New RCB and other culverts with approaches for all other access.
Services

Ready to start a project?

Get in touch with our Markets experts today.

Related Projects

Clean Fuels Alliance America−GREET Emissions Calculator
View More
Great River Energy Spill Prevention, Control, and Countermeasures Plans for Electrical Substations Throughout Minnesota
View More
Great River Energy Route Analysis for a Project Corridor Between Athens and Martin Lake Substations
View More
Otter Tail Power Company Spill Prevention, Control, and Countermeasure Plans
View More
Scroll to Top

Grant Research

We begin by thoroughly researching available grant opportunities to identify those best suited to your specific project needs. Our team leverages our deep understanding of federal, state, and local grant programs, as well as foundation grants, to ensure a comprehensive search. We evaluate eligibility criteria, funding priorities, and timelines to match your project with the most appropriate funding sources. This targeted approach maximizes the potential for securing financial support for your project.