Otter Tail Power Company Spill Prevention, Control, and Countermeasure Plans

Otter Tail Power Company Spill Prevention, Control, and Countermeasure Plans

Otter Tail Power Company Spill Prevention, Control, and Countermeasure Plans

Background

The Clean Water Act and 40 CFR 112, as amended, require that certain nontransportation-related oil storage and consuming facilities maintain a Spill Prevention, Control, and Countermeasure (SPCC) plan. Electrical substations contain oil-filled equipment and are therefore subject to these regulations. To evaluate whether an SPCC plan is required, a few key questions must be considered:

  • Is the site an aboveground storage facility that contains more than 1,320 gallons of oil (total)? Single pieces of equipment containing 55 gallons or less do not count towards the total volume of oil.
  • Is the site an electrical substation near an area designated as a water of the United States, adjoining shoreline, or protected resource that could be impacted in the event of a spill?

A reportable spill event includes a discharge of oil into or upon navigable waters, adjoining shorelines, or protected resources in a quantity sufficient to cause an oil slick or sheen on the surface of the water.

The Project

HEI has worked with Otter Tail Power Company since 2004 to evaluate and prepare SPCC plans for their substations located in Minnesota, North Dakota, and South Dakota.

HEI’s approach to the SPCC plans has been to work cooperatively with Otter Tail Power Company staff to gather background information for the respective substations. This is followed by a field evaluation, where the site and adjacent areas are investigated and nearby navigable waters identified.

The background and field data are used to analyze and model spills using MOSES (Mineral Oil Spill Evaluation System), which was developed by the Electric Power Research Institute. Following analyses, an evaluation, analysis, or SPCC plan is prepared for the electric substation.

The ultimate purpose of the SPCC Plan is to help prevent spill events and, in the event of a spill, to identify the proper procedures to control such events.

  • Trusted fieldwork and data collection for each substation site combined with the MOSES analysis.
  • Reliable approach for evaluating the substation sites to categorize them in terms of their plan requirements: a spill plan, an analysis, or an evaluation.
  • Worked cooperatively with Otter Tail Power Company staff to develop spill plans, analyses, and evaluations for the substation sites that satisfied the requirements of the Clean Water Act and 40 CFR Part 112, and the requirements specific to Otter Tail Power.
Project Details

Client: Otter Tail Power Company

Location: Fergus Falls, MN

Project Highlights
  • Trusted fieldwork and data collection for each substation site combined with the MOSES analysis.
  • Reliable approach for evaluating the substation sites to categorize them in terms of their plan requirements: a spill plan, an analysis, or an evaluation.
  • Worked cooperatively with Otter Tail Power Company staff to develop spill plans, analyses, and evaluations for the substation sites that satisfied the requirements of the Clean Water Act and 40 CFR Part 112, and the requirements specific to Otter Tail Power.
Services

Ready to start a project?

Get in touch with our Environmental experts today.

Related Projects

Clean Fuels Alliance America−GREET Emissions Calculator
View More
Great River Energy Spill Prevention, Control, and Countermeasures Plans for Electrical Substations Throughout Minnesota
View More
Great River Energy Route Analysis for a Project Corridor Between Athens and Martin Lake Substations
View More
Cass County Highways 23 and 10, Casselton Ethanol Plant Two Mile Reconstruct–10-Inch PCC Pavement
View More
Scroll to Top

Grant Research

We begin by thoroughly researching available grant opportunities to identify those best suited to your specific project needs. Our team leverages our deep understanding of federal, state, and local grant programs, as well as foundation grants, to ensure a comprehensive search. We evaluate eligibility criteria, funding priorities, and timelines to match your project with the most appropriate funding sources. This targeted approach maximizes the potential for securing financial support for your project.