Great River Energy Spill Prevention, Control, and Countermeasures Plans for Electrical Substations Throughout Minnesota


Great River Energy Spill Prevention, Control, and Countermeasures Plans for Electrical Substations Throughout Minnesota
The Clean Water Act and 40 CFR 112, as amended, require certain non-transportation-related oil storage and consumption facilities to maintain a Spill Prevention, Control, and Countermeasures (SPCC) Plan. Electrical substations contain oil-filled equipment and are therefore subject to these regulations.
The criteria used to evaluate whether an SPCC Plan is required for an electrical substation include the following:
A spill event includes a discharge of oil into or upon navigable waters, adjoining shorelines, or protected resources in a quantity sufficient to cause an oil slick or sheen on the surface of the water. Navigable waters is defined in 40 CFR Part 112, Section 112.2, and includes all waters with a past, present, or possible future use in interstate or foreign commerce, including all waters subject to the ebb and flow of the tide; all interstate waters including interstate wetlands; and all other waters such as intrastate lakes, rivers, streams, mudflats, sandflats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, or natural ponds, whose use, degradation, or destruction could affect interstate or foreign commerce.
HEI worked cooperatively with Great River Energy (GRE), Crow Wing Power, Lake Country Power, Mille Lacs Electric Cooperative, Arrowhead Electric Cooperative, Inc., North Itasca Electric Cooperative, Cooperative Light and Power, Head of the Lakes Cooperative, and Agralite Electric Cooperative to evaluate and prepare SPCC Plans as appropriate.
HEI’s approach to the SPCC Plans was to work jointly with GRE and its member cooperatives to gather background information for the respective substations. This was followed by a field evaluation whereby the site and adjacent areas were investigated and any nearby navigable waters identified. HEI analyzed the background and field data and performed spill modeling, if applicable, using the Mineral Oil Spill Evaluation System (MOSES), which was developed by the Electric Power Research Institute. Following this analysis, the team prepared an Evaluation, Analysis, or SPCC Plan for the electric substation.
The ultimate purpose of the SPCC Plan is to help prevent spill events and, in the event of a spill, to outline the proper procedures to control such events.
Location: Substation Sites located Throughout Minnesota
explore our
We use cookies to enhance your browsing experience, provide analytics, and improve our services. By choosing “Accept” you consent to our use of cookies as described in our Privacy Policy.
We begin by thoroughly researching available grant opportunities to identify those best suited to your specific project needs. Our team leverages our deep understanding of federal, state, and local grant programs, as well as foundation grants, to ensure a comprehensive search. We evaluate eligibility criteria, funding priorities, and timelines to match your project with the most appropriate funding sources. This targeted approach maximizes the potential for securing financial support for your project.