Overview

The City of Middle River retained Houston Engineering, Inc. to determine the source of the problem, develop a plan to address the problem, provide construction plans and specifications, establish a source of funding and assist the city in proceeding through the required funding process, and establish a reasonable long term design criteria for future city growth and use.

Background

The City of Middle River wastewater lagoon was constructed in 1979 and since has had several problems with overflowing/bypassing during wet conditions. In addition, several occurrences of effluent exceeding the allowable water quality contaminant levels have been recorded. The city has been warned by MPCA to address the problem. Considering cost and scheduling as significant concerns, the city was required to explore funding options and reconstruction considerations to address their immediate and long term needs.

The Project

The City of Middle River retained Houston Engineering, Inc. to determine the source of the problem, develop a plan to address the problem, provide construction plans and specifications, establish a source of funding and assist the city in proceeding through the required funding process, and establish a reasonable long term design criteria for future city growth and use.

As part of the lagoon reconstruction project, the existing sanitary sewer collection system, manholes, and backup power system were evaluated in order to combine this work into the overall project. Cleaning and televising of the sewer system in addition to communications with MPCA were conducted to assure the project addressed current and future needs and requirements into the future.

  • Provided immediate engineering services identifying the problem; prepared a Preliminary Engineer’s Report, facility plan, and construction documents; and investigated funding options for the project.
  •  Communicated with the MPCA and other state agencies in coordinating project needs, costs, and available funds.
  • Successfully provided full scope engineering services from project planning through construction completion.
Project Details

Market: Local Government

Client: City of Middle River, Minnesota

Location: Middle River, Minnesota

Project Highlights
  • Provided immediate engineering services identifying the problem; prepared a Preliminary Engineer’s Report, facility plan, and construction documents; and investigated funding options for the project.
  •  Communicated with the MPCA and other state agencies in coordinating project needs, costs, and available funds.
  • Successfully provided full scope engineering services from project planning through construction completion.
Services

Ready to start a project?

Get in touch with our Municipal Infrastructure experts today.

Related Projects

Web GIS Application for Disadvantaged Communities
View More
Roseau Street Reconstruction Projects
View More
Edgewood Estates Residential Development
View More
Scroll to Top